A floor you specified failed? What professional indemnity covers for an interior designer in Ireland

Floor finishes chosen by an interior designer aren’t always durable. At first, the finish may appear fine, but after several months, it may start to come off. Then the customer will have to spend money to remove the old floor and install a new one, and they will want to know who should be held accountable.

When most designers evaluate what went wrong with a project, they first consider whether the issue was due to bad advice they gave or if someone else made an error. The type of coverage provided by their policy will vary depending on how much responsibility they had for the project.

Why a design mistake costs the client money

The interior designer's role is primarily to develop ideas on paper. The client receives the designs and specifications for the space, which are then used by the construction company or fitter to create the finished product. The designer uses their creative abilities to select materials and lighting to enhance the overall design.

So a mistake in a specification is very different from an accident at the job site. If a floor finish is wrong for the area where it will be installed, no one is injured. However, the client pays for the exact same work twice and that is what makes this a big problem.

Does professional indemnity cover a floor finish an interior designer specified?

For an interior designer who did nothing but specify what needed to be done, the floor issue would typically fall under Insify’s professional indemnity for interior designers. The policy includes design and specification work, so everything from materials to finishes to lighting that the designer specifies.

Construction work and project management are not part of this policy. So, if you are a designer and have also taken on a managerial role overseeing the people doing the building, then that part of your work is not covered by the policy.

Managing the builders is a different job from designing the room

When you run the builders, you decide who will do which tasks on site, and then you check their progress as they go. It’s called project supervision, and if your policy was designed for a designer, it doesn't include this.

Most designers hold both public liability insurance and professional indemnity insurance. Professional indemnity insurance covers issues with the design, and public liability insurance covers injury to people or damage to their property, like if you accidentally scratch your client's brand-new dining table while taking measurements.

A designer decides how much Professional Indemnity they want. Through Insify, they can choose a limit for each claim between €125,000 and €1.25 million, and up to two times this amount within an insurance year. A claim will be based on the client's losses, not the designer's fees.

Why floor finishes fail in the first place

Most floor failures have a simple cause, and few of them show up on the day the floor goes down. Moisture is the usual suspect. A new screed can take weeks or even months to dry, and a timber, vinyl or resin finish laid on top too early can lift, bubble or warp. The same applies to older floors in rooms with a damp problem.

Underfloor heating is another common cause. Not every finish or adhesive is suitable for it, and some products have a maximum surface temperature. A finish that works well in a bedroom can move or crack over a heated floor.

Then there is everyday use. A hallway, a busy kitchen or a shop floor takes far more wear than a guest room. Pets, office chairs on castors and wet areas all ask for a different finish, and manufacturers usually state clearly what their product is and is not suitable for.

Simple checks before a specification goes out

Read the manufacturer’s data sheet for both the finish and the adhesive, and check that the room, the subfloor and any heating match what the product is made for. Where a new screed is involved, ask the contractor how and when the moisture level will be measured before the floor is laid.

Ask the client how the room will really be used, not only how it should look. Write that down in the specification, together with the product name, the colour and the installation instructions from the manufacturer. If a sample is available, let the client see it in the room itself and in daylight.

Where the fitter proposes a different adhesive, underlay or finish, ask for the data sheet of that product as well before you approve the change.

Keep a record of what was agreed

Projects change along the way. A client asks for a cheaper finish, or a fitter suggests an alternative because the original product is out of stock. Note every change, who asked for it and when, and send the client a short confirmation by email. Keep the drawings and specifications per version.

If a floor does fail later, that record shows what was specified, what was changed and by whom. It makes the conversation with the client and the contractor a lot more straightforward.

What to do when a client complains about a floor

If a client reports a problem, respond quickly and calmly. Visit the site, take dated photos of the damage and ask the fitter and the supplier for their view. Avoid admitting fault or promising to pay for a new floor before you know what actually caused the failure.

Tell your insurer as soon as you become aware of a possible claim, even if the client has not yet asked for money. Policies usually expect early notice, and late reporting can make a claim harder to handle. Share your specification, the product data sheets and your record of changes, so the cause can be established and the claim assessed on the facts.

It also helps to agree with the client who will carry out repairs while the cause is being investigated. A temporary fix by the fitter can prevent further damage, but make sure the original condition is photographed first, so the evidence is not lost before anyone has been able to look at it.

Be clear about your role before the next job starts

A productive conversation with a client should happen prior to starting any work, and it's all about roles. One task for a designer is to create designs and specifications, another is to manage the builders. A client who understands whether they have hired you to perform the former or the latter will know when your responsibilities as a designer end.

Insify's professional indemnity for interior designers covers design and specification, keeps project supervision outside the policy and leaves the limit for the designer to choose.